T30 MAKEOVER
HomeProjectsChallengesThe AccountingThe NameMusingsOn-Water Photos
Projects Accomplished 14

Ayacucho Projects November 2005 to June 2006

Main Objectives: Paint the transom, more detail work.
Not so much new stuff, but more beefing of old systems and bright work


1.    Add T to engine seawater pump inlet for fresh water on land

2.    Put a ball valve on engine bypass hose for better temp control

3.    Replace cockpit drain hoses with PVC pipe and rubber elbows to provide better drainage and avoid blockage from water in hose low spots.  This is so any propane from the gas valve and grille can escape overboard.

4.    Add a backup bilge pump.

5.    Repair and replumb manual bilge pump.

6.    Add an FM adapter to VHF antenna.

7.    Make a tool organizer for tool drawer.

DSCN2589.JPG

8.    Make a shelf for ring binders

Maincab14.JPG

9. Made a storage rack for chart books

Chartbook2.JPG

10. Paint and reletter trasnom.

Transom01.JPG

Transom09.JPG

Transom09.JPG

11.    Reinforce stem fitting. (Through-bolt and backing plate instead of threading to fitting)

Deck17.JPG

12.    Add 3rd set of T-tracks near toe rail.

Deck15.JPG